On 16th,Octorber 2017, ORIEMAC shipped 1 unit XGMA wheel loader 3ton was shipped to Mombasa port by one 40HQ container, then client transited to Uganda by themselves.
The main configuration of XG932H as following:
|
On 16th,Octorber 2017, ORIEMAC shipped 1 unit XGMA wheel loader 3ton was shipped to Mombasa port by one 40HQ container, then client transited to Uganda by themselves.
The main configuration of XG932H as following:
|